Groundbreaking: New Chemistry and Biotechnology Building

09/26/2022













MiraCosta College Celebrates Groundbreaking for New Chemistry and Biotechnology Building


The community is invited to the groundbreaking ceremony to mark the start of construction for the new Chemistry and Biotechnology Building at MiraCosta’s Oceanside Campus.

The new building will provide a state-of-the-art facility with chemistry and biochemistry labs and two 40-seat flexible classrooms. As the District’s Biotechnology program expands, the building will provide needed space for growth and is a major component of the Science, Technology, Engineering, and Mathematics (STEM) quad and plaza. The $46.9 million project is scheduled to be completed in summer 2024 and is funded through MiraCosta’s capital improvement program using funds from Measure MM.

WHEN: Monday, October 17, 2022, 10:30 a.m.  
 
WHERE: MiraCosta College, 1 Barnard Drive, Oceanside.
Please park in Lot-5A and walk across the pedestrian bridge. View map 
 
The new Chemistry and Biotechnology Building on the Oceanside Campus, a design-build partnership between HED and C.W. Driver, comprising 23,000 square feet of new, state-of-the-art STEM instructional space for 21st century learning. It takes a 'science on display' approach to stimulating student interest and sharing aspects of the Chemistry and Biotech programs with visitors as well.

The project is intended to advance MiraCosta College’s STEM curriculum to the next level with the help of the facility's mix of instructional, work, social, and laboratory spaces. The entire building will be outfitted with the latest learning technology systems, helping to foster instructional flexibility that will benefit both students and faculty.

The facility will include several unique design features:
The design takes advantage of the mild climate of Oceanside through the incorporation of a 'big roof' that provides a weather-protected exterior space for gatherings and interactions and serves as a transition from the building into the quad.
Porches of varying widths, covered and screened, are used to promote connections to adjoining spaces and provide exterior study and meeting spaces for students.
Large windows and continuous circulation routes allow easy circulation around the building without disturbing classes and labs.
The park-like setting will feature extensive native species and drought-tolerant plants.
High-efficiency fixtures will be used throughout.
Exterior and interior finishes will feature eco-friendly materials with warm colors that complement neighboring buildings at the Oceanside Campus and the local habitat.

Visuals/Media Availability:
Construction and excavation equipment
Demolition activities
Ceremonial “scoop” with District and College leaders and dignitaries
Renderings
Interviews are available with MiraCosta College Superintendent/President Dr. Sunita Cooke, MiraCosta College Board President Anna Pedroza, and members of the project design and construction team
Spanish speakers available
 
Chemistry & Biotechnology Building Building Project Partners
Design/Build Team: HED/C.W. Driver
Landscape Architect: KTUA
Civil Engineer: NV5
Electrical Engineer: Michael Wall Engineering
Mechanical Engineer: MA Engineers
Structural Engineer: Miyamoto International Geotechnical Engineer: SMS Geotechnical Engineers
Inspector of Record: Blue Coast Consulting



Related News

Project Fuerte Empowers Hispanic Students in Biosciences

Project Fuerte Empowers Hispanic Students — MiraCosta College's $3M Initiative Boosts Success in Biosciences

NASA Grant to Inspire Future Aerospace Innovators

Grant to Enable Students to Build Space Projects and Engage with NASA Scientists

ESL Graduate Thrives in Engineering Career

Former English As a Second Language Student Builds Career in Engineering